Study on Evaluation of AGC Units to Participate in Frequency Modulation in Power Market

Article Preview

Abstract:

Auxiliary service as the important component of the power market has been more and more attention, and of automatic generation control as the auxiliary services of one of the most important project. AS the auxiliary services market a service, it is necessary to the security of the power grid to influence evaluation. This paper according to North American electric power reliability of the CPS association, the share of the responsibility method, CPS evaluation indexes apportioned to each unit, can provide service for each single unit of evaluation, is beneficial to the healthy development of the market.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2038-2042

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] LU Yi, XIAO Lan. AGC Quantitative Assessment of Unit Ancillary Service Under Control Performance Standard [J] PROCEEDINGS OF THE CHINESE SOCIETY OF UNIVERSITIES. 2009, 21(3): 102-105.

Google Scholar

[2] Ying ZHAO. Overview of power market ancillary services and cost research [J] CHINA ELECTRIC POWER EDUCATION. 2007, z1: 257-259.

Google Scholar

[3] Chunhua TAO, Wenguang MA. AGC cost in power market[J] EAST CHINA ELECTRIC POWER. 2006, 34(4): 5-6.

Google Scholar

[4] Feng ZHOU, Buying WEN, Haozhong CHENG. Research on Cost of AGC in Power Market[J] NORTH CHINA ELECTRIC POWER. 2002, 10: 31-33.

Google Scholar

[5] Xueling LI, Jiena ZHOU. AGC cost in the generation market[J] POWER SYSTEM PROTECTION AND CONTROL. 2008, 26(12): 61-65.

Google Scholar

[6] Juanjuan WANG, Weidong LI, Wenlei ZHAO, Yunli ZHAO. Overview of AGC ancillary service costs in electric market[J] POWER SYSTEM PROTECTION AND CONTROL. 2010, 38(24): 56-60, 76.

Google Scholar

[7] Chenxiong GONG, Jiangang YAO, Xiangui YANG. Evaluation Method of Auxiliary Service Examination and Compensation of AGC Units[J] Proceedings of the Chinese Society of Universities. 2011, 23(5): 137-141.

Google Scholar

[8] Jayant Kumar, Kah-Hoe Ng, Gerald Sheblt. AGC SIMULATOR FOR PRICE-BASED OPERATION PART 1: A MODEL,IEEE Transactions on Power Systems,1997, 527-531.

DOI: 10.1109/59.589593

Google Scholar

[9] R. Raineri,S. Rıos,D. Schiele. Technical and economic aspects of ancillary services markets in the electric power industry: an international comparison. [J]ENERGY POLICY,2005, 1541-1554.

DOI: 10.1016/j.enpol.2004.11.015

Google Scholar

[10] YAO Peng, ZHANG Kao-she, ZHOU Shu, LIANG Jian. The application research of AGC service allotment[J] Power System Protection and Control. 2011, 39(21): 120-125.

Google Scholar