The Reliability Factor Analysis of Rock Tunnel Boring Machine Cutter System

Article Preview

Abstract:

Tunnel Boring Machine (TBM) is a major equipment used in underground engineering and Cutter disk system is its major parts, which affect sharply its capability. The force and vibration characteristics of the cutter system are simulated in this paper, and the effects of its force and vibration on the cutter system reliability are analyzed. These results show that there are the most stress and the worst reliability in these joints between the cutterhead and main driver, the cutterhead and the hob, and cutter ring. These research results are very helpful for increasing the reliability and application of the rock boring machine.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2082-2087

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zhang Zhaohuang, Qiao Yongli. RESEARCH ON THE LAYOUT OF TBM DISC CUTTER, Engineering mechanics (Chinese) 2011, 28(5): 172-177.

Google Scholar

[2] Liu Zhijie, Shi Yanjun, Teng Hongfei. Case-based Reasoning Approach for Cutterhead Principal Parameter Design of Full Face Rock Tunnel Boring Machine. Chinese Journal of mechanical Engineering 2010, 46(3): 158-164.

DOI: 10.3901/jme.2010.03.158

Google Scholar

[3] Wu Yuhou, Wang Chao, Sun Hong, Zhou Peng. ANSYS-based finite element analysis on cutter-plate of rock excavators, Chinese Journal of Construction Machinery 2012, 10(2): 171-176.

Google Scholar

[4] Liu Peng, Gong Yadong, Wang Chao. Finite element simulation analysis for cutter head of Slurry Balance TBM. Advanced Materials Research 2012, 482-484: 1257-1260.

DOI: 10.4028/www.scientific.net/amr.482-484.1257

Google Scholar

[5] Li Hongliang. Troubleshooting for Cutter Disk Cracking of Model TB880 Rock Tunneler, Engineering mechanics (Chinese) 2010, 41: 62-67.

Google Scholar

[6] Hu Liqin; Yuan Run, Chen Hongli, Bai Yunqing. Failure modes and effects analysis on ITER DFLL-TBM system, Fusion Engineering and Design 2012, 7-8: 1307-1309.

DOI: 10.1016/j.fusengdes.2012.03.003

Google Scholar

[7] Zhang Ke, Wang Tengyue, Sun Hong, Wang He, Zhao Kaijun. Simulation Study on Disc Cutter of Full Face Rock Tunnel Boring Machine, Chinese Journal of Shenyang Jianzhu University (nature science) 2010, 26(6): 1209-1213.

Google Scholar

[8] Moon, T.; Oh, J. study of optimal rock-cutting conditions for hard rock TBM using the discrete element method, Rock Mechanics and Rock Engineering 2012, 45(5): 837-849.

DOI: 10.1007/s00603-011-0180-3

Google Scholar

[9] Wu Yuhou, Sun Jian, Zhou Peng, Sun Hong. Research on the Adaptability of TBM Disc Cutter to the Character of Rocks, Chinese Journal of Shenyang Jianzhu University (nature science) 2012, 28(1): 156-161.

Google Scholar

[10] Pu, Y, Liu J. Q, Guo, W. Kinematics modeling and analysis of TBM disc cutter based on D-H matrix, Advances in Materials Manufacturing Science and Technology 2012, 697-698: 692-696.

DOI: 10.4028/www.scientific.net/msf.697-698.692

Google Scholar