Research on the On-Line Monitoring System for Partial Discharge of Cable Joint

Article Preview

Abstract:

This paper introduces an on-line monitoring system for partial discharge of 10kV cable joint based on LabVIEW. It calculates transfer characteristic of wideband current transformer for monitoring partial discharge current after analyzing the mechanism of production of partial discharge. The proposed current transformer can restrain the noise signal efficiently in electromagnetic induction part. Since the on-line monitoring system was installed in transformer substation, the LabVIEW monitoring platform can keep a lookout over partial discharge current of cable joint constantly. It can monitor the cable joint accurately.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

986-991

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xianzhi Yang, Jian Zhang. Electric Power Science And Engineering, 2011, 27(06): 71-75.

Google Scholar

[2] Zhendi Gao, Yanqing Li, Wenxi Lu. Electric Power Science and Engineering, 2009, 25(5): 23-26.

Google Scholar

[3] Wenzhi Chang, Chengrong Li, Qi Su, Zhendong Ge. Proceedings of the CSEE, 2013, 33(0): 1-10.

Google Scholar

[4] Tao Zhao, Xiaoyan Wang, et al. Electric Power Science And Engineering, 2012, 28(12): 63-67.

Google Scholar

[5] Ying Song. Research on Signal Detection and Pattern Recognition of Partial Discharge in XLPE Cable [D]. North China Power University, (2011).

Google Scholar