[1]
Tanrounglak S, Horowitz S H, Phadke A G, et al. Anatomy of power system: preventive relaying strategies. IEEE Transactions on power delivery, 1996, 11(2): 708-714.
DOI: 10.1109/61.489327
Google Scholar
[2]
Koeunyi B, Thorp J S. An importance sampling application: 179 bus WSCC system under voltage based hidden failures and relay misoperations. Proceedings of the Thirty-First Hawaii International Conference on System Sciences, Hawaii, 1998, 3: 39-46.
DOI: 10.1109/hicss.1998.656010
Google Scholar
[3]
ZHOU Zong-fa, AI Xin, DENG Hui-qiong, LIU Hao. A Method to Analyze Power System Cascading Failure Based in Fault Tree and Fuzzy Reasoning. Power System Technology, 2006, 30(8): 87-91.
Google Scholar
[4]
SONG Fu-long, LUO Yi, TU Guang-yu, LUO Jin-shan. FTA-based fault chains monitoring research in power system. Relay, 2006, 34(2): 29-34.
Google Scholar
[5]
Bie Zhaohong, Wang Xifan. Studies on reliability evaluation of cascading faults of complicated power systems. Automation of Electric Power Systems, 2001, 25(15): 25-28, 42.
DOI: 10.1109/icpst.2002.1053577
Google Scholar
[6]
Bie Zhaohong, Wang Xifan. Studies on models and algorithms of reliability evaluation for cascading fault of complicated systems. Automation of Electric Power Systems, 2001, 25(10): 30-34.
Google Scholar
[7]
Zhaohong Bie, Xifan Wang. Evaluation of power system cascading outages. Proceedings of International Conference on Power System Technology. Kunming, China: [s. n. ], 2002: 415-419.
DOI: 10.1109/icpst.2002.1053577
Google Scholar
[8]
LI Rong-rong, ZHANG Ye, JIANG Quan-yuan). Risk Assessment for Cascading Failure of Complex Power System[J]. Power System Technology, 2006, 30(10): 18-23.
Google Scholar
[9]
J. M. S. Pinheiro, C. R. R. Dornillas, M. Th. Scchilling, etal. Probing the New IEEE Reliability Test System (RTS-96): HL-II Assessment. IEEE Transactions on Power Systems, 1998, 13(1): 171-176.
DOI: 10.1109/59.651632
Google Scholar