Study of Production Scheduling of the Digital Workshop on Limited Cache Area

Article Preview

Abstract:

In view of the limitations of EPR infinite capacity theory, and based on that the infinite capacity of production scheduling methods already can not adapt to modern enterprise management requirements, this paper regards the digital unmanned workshop as the research object, and build a kind of digital workshop production scheduling model based on limited buffer zone, and present the solving method. The model can improve the utilization rate of machine tools under the circumstances of limited buffer area. At the same time it provides a practical and effective solution to solve the emergency single plug.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1860-1862

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Liu  Zhaoqin.  The Low Utilization  Factors  Analysis  and  Countermeasures  of  CNC Machine Tools in China. Journal of Chongqing Aerospace Polytechnic. 2010(8).

Google Scholar

[2] Yue Minyi, Han Jiye. Nworkpiece  in the Machine Machining Sequence Problems. Science in China. 1975(5).

Google Scholar

[3] Marcos  Singer.  Decomposition  Methods  for  Large Job Shops.  Computer &  Operations Research. 2001, 28: 193~207.

DOI: 10.1016/s0305-0548(99)00098-2

Google Scholar

[4] Tian Jian. Research of  Production Scheduling  Problems in  Gear Machining  Workshop[D]. Nanchang: Nanchang University of Mechanical & Electrical Engineering. 2011: 9-12.

Google Scholar

[5] WANG Cheng, LIU Xiao-bing. Production Scheduling Model Based on the Finite Capacity of Discrete Manufacturers. Science-Technology and Management. 2012(4).

Google Scholar

[6] Jin Weiwei. Based on  ERP System Application Research of  Advanced  Planning Scheduling. Informatization Research . 2010(12).

Google Scholar