[1]
WANG Qihang, WU Zaijun, ZHAO Shanglin, et al. Application of IEEE 1588 time synchronization in digital substation[J]. Power System Protection and Control, 2010, 38(19): 137-141.
Google Scholar
[2]
IEC61850, Communication networks and systems in substations [ S] . (2003).
Google Scholar
[3]
GE Yili, GE Hui, LU Dayong. Problems in design and operation of digital substation[J]. Electric Power Automation Equipment, 2010, 30(12): 113-117.
Google Scholar
[4]
BU Xiande, SHI Qiusheng, ZHao, et al. Study on clock synchronization technology for communication equipment in digital substations[J]. Telecommunications for Electric Power System, 2010, 31(213): 5-9.
Google Scholar
[5]
Premaratne U, Samarabandu J, Sidhu T S, et al. Security analysis and auditing of IEC61850-Based automated substations[J]. IEEE Trans on Power Delivery, 2010, 25(4): 2346-2355.
DOI: 10.1109/tpwrd.2010.2043122
Google Scholar
[6]
MO Jun, TAN Jian-cheng. Research on network security in substation based on IEC61850[J]. Telecommunications for E1ectric Power System, 2009, 30(198): 12-16.
Google Scholar
[7]
RAN Xiao-tao, NIE Yi-xiong, YIN Xiang-gen. Research on substation secondary circmt communication system using OPNET simulator[J]. Power System Technology, 2005, 29(6): 67-7.
Google Scholar
[8]
TONG Xiao-yang, LIAO Chen-song, ZHOU Li-long, et al. The simulation of substation communication network based on IEC 61850-9-2[J]. Automation of Electric Power Systems, 2010, 34(2): 69-74.
Google Scholar
[9]
ZHU Lin, DUAN Xian-zhong. Communication architecture of process bus based busbar protection[J]. Automation of Electric Power Systems, 2008, 32(21): 8-13.
Google Scholar
[10]
GAO Hui-sheng, JIN Wei-wei. Research on end- to-end delay for substation communication based on OPNET simulator[J]. Relay, 2006, 34 (19): 33-37. ZHAO Shanglin, HU Minqiang, DOU Xiaobo, et al. Research of time synchronization in digital substation based on IEEE 1588[J]Power System Technology, 2008, 32(21): 97-10.
Google Scholar