[1]
A. Jaffar, N. H. A. Halim, and N. Yusoff, Lean manufacturing implementation through material and information flow chart (MIFC) at assembly area, Int. Conference of Mechanical Engineering Research. (2011).
Google Scholar
[2]
A. Jaffar, N. H. A. Halim, and N. Yusoff, Effective Data Collection and Analysis for Efficient Implementation of Standardized Work (SW), J. of Mechanical Engineering. 9 (2012) 45-78.
Google Scholar
[3]
V. K. Khanna and R. Shankar, Journey to implement Toyota production system – A case study, J. of Advances in Management Research. 5(1) (2008) 80-88.
DOI: 10.1108/97279810880001269
Google Scholar
[4]
A. Jaffar, N. H. A. Halim, N. Yusoff and A. N. Adnan, Gravity Flow Rack's Material Handling System for Just-In-Time (JIT) Production, Int. Symposium on Robotics and Intelligent Sensors. (2012) 1714-1720.
DOI: 10.1016/j.proeng.2012.07.373
Google Scholar
[5]
Terziovski, M. & Sohal, A. S., The adoption of continuous improvement and innovation strategies, Technovation. 20 (2000) 539-550.
DOI: 10.1016/s0166-4972(99)00173-x
Google Scholar
[6]
Marksberry, P., Bustle, J. and Clevinger, J., Problem solving for managers: A mathematical investigation of Toyota's 8-step process, J. of Manufacturing Technology Management. (2010) 1-19.
DOI: 10.1108/17410381111160924
Google Scholar
[7]
Liker, J. and Hoseus, M., Toyota culture – The heart and soul of the Toyota way, first ed., USA, McGraw-Hill, (2008).
Google Scholar
[8]
Mann, D., Creating a lean culture, first ed., Productivity Press, New York, USA, (2005).
Google Scholar
[9]
M. Rother and J. Shook, Learning to see: value stream mapping to create value and eliminate muda (foreword by Jim Womack and Dan Jones), 1. 2 ed., Lean Enterprise Institute, USA, (1999).
Google Scholar
[10]
Lawrence, S. A., Productivity measurement and improvement, second ed., Prentice Hall Inc., Michigan, USA, (1992).
Google Scholar
[11]
Patel, S., Shaw, P. and Dale, B.G., Set-up time reduction and mistake proofing methods, Business Process Management Journal. 7 (1) (2001) 65 – 75.
DOI: 10.1108/14637150110383953
Google Scholar
[12]
A. Jaffar & N. H. A. Halim, Set-Up Time Reduction Through Single Minute Exchange of Dies (SMED) at Assembly Line, Int. Conference on Advances in Mechanical Engineering. (2010).
Google Scholar
[13]
N. Slack, S. Chambers and R. Jahnston, Operations management, fifth ed., Prentice Hall, New Jersey, USA, (2007).
Google Scholar
[14]
L. Cuatrecasas-Arbos, J. Fortuny-Santos and C. Vintro-Sanchez, The operations-time chart: A graphical tool to evaluate the performance of production systems, Computers & Industrial Engineering in Press, 1016 (2010).
DOI: 10.1016/j.cie.2011.04.022
Google Scholar
[15]
G. Stalk and T. M. Hout, Competing against time - how time-based competition is reshaping global markets, The Free Press, New York, USA, (1992).
Google Scholar
[16]
U. Murugaiah, S. J. Benjamin, M. S. Marathamuthu and S. Muthaiyah, Scrap loss reduction using the 5-whys analysis, Int. J. of Quality and Reliability Management. 27 (2010) 527-540.
DOI: 10.1108/02656711011043517
Google Scholar
[17]
L. L. Myint, Process analysis and optimization of biodiesel production from vegetable oil, M. S. Thesis, Texas A&M University, College Station, USA, (2007).
Google Scholar