Investigation of the Impact of BIM&IPD on Change Orders Using Bayesian Network Method

Article Preview

Abstract:

Change orders present one of the largest sources of cost growth on building construction projects and have negative impact on productivity, labor efficiency and building environment. Building Information Modeling (BIM) is proved a high technology that greatly benefits both design and construction, greatly promoting the design visualization and construction 4-D modeling. Driven by BIM, Integrated Project Delivery (IPD) emphasizes communication in the collaborative process by avoiding adversarial or counter-productive professional relationships to reduce waste and rework. If BIM&IPD can be properly applied in project, quite a lot change orders can be avoided and then project cost will be reduced. This paper investigates the impact of BIM&IPD on construction change orders using Bayesian Network method. Bayesian Network is a graphic model representing cause and effect relationship between change orders and BIM&IPD. In this paper, evidence reasoning and probabilistic inference analyses are conducted to indicate the causes in light of the results and forecast the results according to causes. From the analysis, Bayesian Network is proved a good tool for construction managers to make decisions.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2064-2068

Citation:

Online since:

September 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] S. Moselhi, I. Assem, and K. EI-Rayes, submitted to Journal of Construction Engineering and Management, (2005).

Google Scholar

[2] W. Ibbs, submitted to Journal of Construction Engineering and Management, (2005).

Google Scholar

[3] J.E. Diekmann and M.C. Nelson, submitted to Journal of Construction Engineering and Management, (1985).

Google Scholar

[4] P. Vandenberg, University of Wisconsin: Madison, Wisconsin, (1996).

Google Scholar

[5] D. Cunz, Report from Mortenson Construction, (2009).

Google Scholar

[6] C.A., Leonard, Dissertation on Concordia University: Montreal, Quebec, (1988).

Google Scholar

[7] A.D. Smith, submitted to Project Management Journal, (2003).

Google Scholar

[8] BIM: Smart Market Report in Design & Construction Intelligence, McGraw Hill Construction, (2008).

Google Scholar