Construction Research on the Green Hydropower of Houziyan Hydropower Station

Article Preview

Abstract:

The idea of green environmental has become a guiding ideology of construction, but green hydropower is still lack of materials and the theoretical system is not yet complete. That is to say, green hydropower is still at the preliminary design stages in our country. In addition, with our country’s different regional conditions, we can’t completely copy the foreign experience of green hydropower construction. Houziyan Hydropower Station is located in Kangding, Sichuan province with fragile ecosystems, and most residents are ethnic minority. On the basis of the existing system of green hydropower at home and abroad, the article is combined with the Houziyan regional characteristic of humanity and the environment to construct the evaluation index and certificate authority of Houziyan Green Hydropower from the national conditions of our country, which will provide the reference for the related personnel and units.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

717-721

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Heng Liu, Guofeng Dong, Runrun Zhang. Constructs the Green Water and Electricity Appraisal and Authentication System with Chinese Characteristic[J]. China Water Resources, 2010. (22): 46-51.

Google Scholar

[2] Zhenhua Cui, Xing Chen. An Analysis on Implementation Strategy of Green Hydropower Certificate in China[J]. China Waterpower & Electrification, 2011, (11): 21-26.

Google Scholar

[3] Fanggang Song, Xiaopeng Shen, Yijun Zhu. The Study About Land Acquisition and Resettlement in the Construction of Houziyan Green Hydropower[J]. Sichuan Water Power, 2012, 31(2): 108-110.

Google Scholar

[4] Shumin Zhou. The vegetation Protection and Ecological Restoration on Project Region of Pubugou Hydropower Station[J]. Sichuan Water Power, 2011, 30(2): 149-153.

Google Scholar

[5] Xuezhong Yu ,Jianxin Xia ,Jing Yang, et al. Preliminary study on the index system and assessment method of green hydropower[J]. Journal of Hydroelectric Engineering, 2011, (3)803-810.

Google Scholar

[6] Wanlin Tang, Xuezhong Yu. The reference of hydropower certification system aboard for our country[J]. Resources and Environment in the Yangtze Basin, 2007, 16(1): 123-127.

Google Scholar