Risk Identification in Bridge Construction Stage Based on Fuzzy Hierarchy Analysis

Article Preview

Abstract:

Due to the characteristic of ordinal consistency in the analytical hierarchy process (AHP) difficult to meet, the method combined AHP and the theory of fuzzy mathematics is introduced, the idea of fuzzy analytic hierarchy process is introduced innovatively. The failure mode and the main factor of failure induced during construction of bridge engineering are identified. The method can exert the brain advantage of evaluation, and simplify the computation process.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1552-1555

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yongqing Zhang: submitted to Journal of Xi'an Highway University(2001) In Chinese.

Google Scholar

[2] Satty T. L: submitted to Proceedings of the First International Conference on Mathematical Modeling. University of Missourerolla, (1977).

Google Scholar

[3] Gengqi Niu : submitted to China Safety Science Journal(2003) In Chinese.

Google Scholar

[4] Jun Chen, Deming Zhang: submitted to Journal of Shijiazhuang Railway Institute(2010)In Chinese.

Google Scholar

[5] Shiyong Li: Application of fuzzy mathematics and engineering (Harbin Institute of Technology Press. China 2004).

Google Scholar

[6] Feng Lou, Yong He: submitted to China Safety Science Journal(2010) In Chinese.

Google Scholar