Sequence of Urban Bridge Maintenance and Repair Based on Multiple Factors

Article Preview

Abstract:

With the bridge maintenance reinforced gradual increase in demand, the maintenance and repair of bridges and related facilities need to spend a lot of money. And the bridge of the limit line, weight limit, demolition and reconstruction measures will have a significant impact on traffic. Therefore, bridge maintenance decisions had become a problem faced by the facilities management department. In the case of limited funds, how can we determine the order of bridge repair and reinforcement, take the maintenance of the extent to which the urgent need for a systematic, efficient and practical method to develop optimal bridge maintenance and repair strategies to ensure that high-risk bridge timely conservation maintenance. This paper proposes a method of bridge maintenance and repair ranking The paper analyze a multivariate method, get result of multivariate, and verify the feasibility of the approach by using an example.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1682-1686

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] HongjunFan, Tieyin Liu. Communications Standardization, 2009. 10Semimon- thly (Total 206).

Google Scholar

[2] QiangChen, Xiaoyan Zhang. Highway Engineering, 2012. 6, Volume 37 No. 3.

Google Scholar

[3] Lijun Sun. Road and airport facilities management(In Chinese). People's Commun- ications Press. 2009. 2.

Google Scholar

[4] Zukang Yao. Pavement Management System(In Chinese). People's Communicati- ons Press,1999: 99—109.

Google Scholar