Discussion on Design of Double-Deck Traffic Concrete Box Girder for City Bridge

Article Preview

Abstract:

For layout space in the limited land resources and improving the utilization efficiency of urban transportation bridge and traffic conditions, in this paper, according to the request of four lanes of roof, two-way urban light rail traffic in the box, considering the requirements of pipeline layout, water supply and drainage, and fire escape, lighting, ventilated at the same time, based on the existing related specification, give full play to the characteristics of the concrete box girder, preliminarily design out of the single box three rooms inclined web box girder for double-deck traffic of urban bridge, in order to provide the reference design.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1691-1694

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] ZHU Ming-qiao. JIANG Wei-zhong. Concrete Huge Box Section Girder and Its Design Theory[J]. Journal of Architecture and Civil Engineering, 2010, 27(3): 85-88.

Google Scholar

[2] FAN Li-chu. Bridge Engineering. [M]. Beijing: People Communication Press. (2001).

Google Scholar

[3] Ministry of Construction of the People's Republic of China. GB 50016—2006. Building Fire Protection Design Specification [S]. Beijing: China Architecture and Building Press, (2006).

Google Scholar

[4] CJJ 37—2012. Urban Road Engineering Design Specifications [S]. Beijing: China Architecture and Building Press, (2012).

Google Scholar

[5] GB50157-2003. Code for Design of Metro [S]. China Plans to Press (2003).

Google Scholar