Analysis of Cement Emulsified Asphalt Mortar Gap on CRTSII Slab Track under Train Loading

Article Preview

Abstract:

The finite element method was used to analyze the deformation and stress of track in different length and height of gaps under the train load. In order to study the influence of gap between the slab and emulsified cement asphalt mortar of china railway track system II slab track on the subgrade, a model of CRTS II slab track was established on the base of elastic foundation beam theory and finite element software ANSYS. The results show that gap between slab and CA mortar has significance effect on the stress and deformation of track structure. The deformation of rail and slab, the longitudinal stress of slab were increase with the increase of gap length, but has less effect on lateral stress of slab. When the length of gap exceed to 1.95m, the deformation and stress have the tendency of increase sharply, the length of gap between slab and CA mortar should not exceed 1.95m. The gap between slab and CA mortar has effect on the durability and lifetime of ballastless track, so the gap should be maintenance timely.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1834-1838

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] J. Xu, Z.H. Chen, K. Wang, Y. Yang: Journal of East China Jiaotong University, Vol. 26 (2009) No. 5, pp.58-62(in chinese).

Google Scholar

[2] T. Wang. Research and application on CA mortar in ballastless slab track of high speed railway(Ph.D., Wuhan University of Technology, China 2008, pp.11-12 (in chinese).

Google Scholar

[3] Y.Q. Wei. Research on cement emulsified asphalt mortar in ballastless slab track of high speed railway(Master., Chang'an University, China 2010, pp.5-9 (in Chinese).

DOI: 10.1061/9780784412299.0065

Google Scholar

[4] S.H. Jin, X.F. Chen, J.Y. Yang: China Railway Science, Vol. 26 (2006) No. 2, pp.20-25(in chinese).

Google Scholar

[5] J. Xiang, D. He: Journal of Traffic and Transportation Engineering, Vol. 7 (2007) No. 3, pp.1-5 (in chinese).

Google Scholar

[6] M.X. Li. Parameters research of longitudinally connected ballastless track on bridge of high speed railway(Master., Central South University, China 2009, pp.20-42 (in chinese).

Google Scholar

[7] P. Xu, C.B. Cai: Journal of Southwest Jiaotong University, Vol. 46 (2011) No. 2, pp.189-194 (in chinese).

Google Scholar

[8] X.L. Song, W.M. Zhai: China Railway Science, Vol. 33 (2012) No. 4, pp.1-7 (in chinese).

Google Scholar

[9] X.Y. Liu, P.R. Zhao, R.S. Yang, P. Wang. The design theory and method for ballastless track on passenger dedicated line[M]. Southwest Jiaotong University Press, (2010), Chengdu (in chinese).

Google Scholar

[10] P. Wang, H. Xu, R. Chen, J.M. Xu: Journal of Southwest Jiaotong University, Vol. 47 (2012) No. 6, pp.929-934 (in chinese).

Google Scholar