Research on Characters and Reinforcement of Silt on the Bottom of Stone Tongue Formed by Reclamation Silt

Article Preview

Abstract:

Drum-shaped stone tongue that there are 3 ~ 5 m thick wedge silt on the bottom formed in the junction of silt and the stone embankment by reclamation silt with mountain stone during the course of backfill. In the paper, on the basis of drills, superficia drilling holes, deep drilling holes and vibrating stop plank model, boundary stone embankment shape and soft soil layer depth were obtained, cross section of stone embankment and stone embankment boundary were revealed during the course of artificial fill, study the stone tongue shape, soft soil around stone tongue, silt characters on stone tongue bottom and reinforcement treatments were studied to obtain treatment method which can satisfy the engineering requirement and can save the engineering cost and provide mature construction technology and method for the similar subgrade treatment of sea reclamation engineering.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

203-206

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xiaonan Gong: Ground improvement handbook, 3rd ed(China Building Industry Press, Beijing 2008)(In Chinese).

Google Scholar

[2] Wan Li, Zhiliang Dong and Zhenghan Chen: Waterway engineering. Vol. 12 (2005), p.55(In Chinese).

Google Scholar

[3] Wan Li, Zhiliang Dong and Zhenghan Chen: Waterway engineering. Vol. 8 (2005), p.61(In Chinese).

Google Scholar

[4] Zhongze Yin, Soil Mechanics and Foundations(Hohai University Press, Nanjing 1999)(In Chinese).

Google Scholar