p.2409
p.2414
p.2419
p.2423
p.2427
p.2431
p.2438
p.2443
p.2448
Disaster Prediction and Preventive Measures of Constructing a Waste Dump on an Abandoned Tailing Pond
Abstract:
According to analyzing geological condition and failure pattern of constructing a 100m high waste dump on QIANYU abandoned tailing pond , It has predicted what disasters would be to villages and industrial buildings around after the waste dump is constructed. It has also determined corresponding preventive measures.
Info:
Periodical:
Pages:
2427-2430
Citation:
Online since:
September 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: