Disaster Prediction and Preventive Measures of Constructing a Waste Dump on an Abandoned Tailing Pond

Article Preview

Abstract:

According to analyzing geological condition and failure pattern of constructing a 100m high waste dump on QIANYU abandoned tailing pond , It has predicted what disasters would be to villages and industrial buildings around after the waste dump is constructed. It has also determined corresponding preventive measures.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2427-2430

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wei Yingqi, LIU Hanlong, YU Xiangjuan, Advances in Science and Technology of Water Resources, 1997(5)37-41, (In Chinese).

Google Scholar

[2] WANG Hai-bin, LI Xiao-chun, MI Zi-jun, YANG Li-yuan, YANG Zhong-lin, Rock and Soil Mechanics , 2011(12)3672-3678, (In Chinese).

Google Scholar