Integral Hoisting Technology of Arch Rib of Concrete Filled Steel Tube Arch Bridge

Article Preview

Abstract:

The construction of integral hoisting of arch rib of concrete filled steel tube arch bridge has the advantages of simple process, easy quality control, small safety risk and not affecting the river navigation, etc. This paper introduces the construction method of arch rib assembly and arch rib large segment hoisting.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3086-3089

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Weikai Wang: Architecture Technology, Vol. 2007 (2). 108-111. (in Chinese).

Google Scholar

[2] Zhicheng Chen: Railway Engineering, Vol. 2007 (3). 36-38. (in Chinese).

Google Scholar

[3] Qingfu LI , Zhanfeng Zhang, Xiong Wang: Construction Technology, Vol. 2006(8). 56-59. (in Chinese).

Google Scholar

[4] Guangsheng Feng: Railway Standard Design, Vol. 2005(10). 42-44. (in Chinese).

Google Scholar