Study on Unbalanced Bidding of Contractor Based on Engineering Change

Article Preview

Abstract:

Contractor uses the unbalanced bidding strategies for the income-generating, because unbalanced bidding can link the engineering change and income-generating. However the lack of knowledge for the change of project state is the key factor that the contractor can not achieve income-generating successfully. First the thesis identified the opportunity of contractor's unbalanced bidding from the construction plan, design drawings, and project amount. By introducing the trigger mechanism to show the trigger mechanism of the unbalanced bidding, it indicates that only when the unbalanced bidding is triggered by the engineering Change the state of project will execute as expected and the profit of contractor can ultimately change from A''' to B'''. Through analyzing the change of state of project under engineering change, the thesis gives unbalanced bidding strategy for contractor.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

3367-3371

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yan Weiping. Implementation of secondary business philosophy to improve the efficiency of project management [J]. Shanxi building . 2009. 7.

Google Scholar

[2] Zhou Jianping, Guo Qun, Kong Hongwei project amount list building economic tender imbalance quoted response [J]., 2010 (2) : 78-80.

Google Scholar

[3] Yin Yi Lin, Qiao Lu, Li Biao. Based unbalanced quote contractor income-generating strategy to resolve [J]. Shenyang Jianzhu University (Social Sciences), 2011, 13 (1) : 40-43.

Google Scholar

[4] He Zengqin engineering project bidding strategy [M] Tianjin: Tianjin University Press, (2004).

Google Scholar

[5] Xu Zhiguo. Talking unbalanced offer project bidding Water Resources and Hydropower Engineering Cost [J]., 2006 (4) : 62-66.

Google Scholar

[6] Wang ze hua. Analysis and control of the project bidding imbalance quoted [Tianjin: Tianjin University, (2010).

Google Scholar

[7] Wu Shan. The highway bidding project unbalanced quote adjustment [J]. The Hunan Transportation Research, 2009, 35 (2) : 63-64, 72.

Google Scholar

[8] TANG Wei, Dong Hongtao. Highway construction bidding phase, how to adjust the unbalanced quotes [J]. Communications Science and Technology, 2009 (7): 166-168.

Google Scholar

[9] Li Zhenjiang. Bidding for highway projects rational use of unbalanced quotation method [J]. Northern Jiaotong, 2010 (4) : 200-202.

Google Scholar

[10] Xu Wenxiao BOQ mode control imbalance in quotes [J]. Managers, 2010 (4): 240.

Google Scholar

[11] Mr. Lee tube tender offer Lin Yun. Discussion imbalance techniques [J]. Huaihe River, 2010 (9) : 44-45.

Google Scholar

[12] Zhang disciplines, Hu Biwu Project Bidding unbalanced quotation method [J]. Ningxia Engineering Technology, 2009, 8 (4) : 379-382.

Google Scholar