Finite Element Analysis on Integral Structure of Light Steel Temporary Buildings

Article Preview

Abstract:

Light steel temporary building is commonly used in the construction site, with advantages on simple structure, repeat used and small deadweight. There are still not enough researches and relevant standards to conduct the design and construction of the buildings. In order to precede to theoretical study on integral structure of light steel temporary buildings a method which used to set up finite element analysis model about integral structure of light steel temporary buildings was proposed in this paper. The method is based on finite element analysis software, Ansys. Using this method a monolayer integral structure, a two-story integral structure and a trilaminar integral structure model were set up. Lateral displacement under design load of the integral structure was solved out by these finite element models.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

921-924

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] G.H. Huang, J.F. Liu: Industrial Construction, Vol. S1 (2007). p.1855. (In Chinese).

Google Scholar

[2] X.Q. Chao, J.P. Hao: Industrial Construction, Vol. 37 (2007). p.712. (In Chinese).

Google Scholar

[3] Z. Zhang, X.F. Cai, Y.C. Ma, J.Z. Zhou: Advanced Materials Research, Vol. 639 (2013). p.141.

Google Scholar