Research on Comprehensive Post-Evaluation of Electric Transmission Project Based on Fuzzy AHP Analysis Method

Article Preview

Abstract:

Post-evaluation of power transmission project will help improve the scientific management level of the construction implementation and operation process, the investment decision-making and returns, and ensure the safe operation of power grid. Based on the theories and methods to establish the evaluation index, considering the low-carbon economy requirements on power grid construction, this article established a post-evaluation index system from the perspective of implementation process, effectiveness and efficiency, social and environmental impact, and sustainable development. According to the content of post-evaluation of power transmission project, it built a fuzzy AHP comprehensive post-evaluation model and took power transmission project as an example to analyze the application of the model.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

280-286

Citation:

Online since:

September 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wang M J J. et al. Fuzzy Set Evaluation of Inspection Performance International[J]. Journal of Man-Machine Studies, 1991, 587~596.

Google Scholar

[2] Satty T.L. Modeling Unstructured Decision Problems: The Theory of Analytical Hierarchies. [J]. Univ. of Missouri. Rolla, 1997, 90~105.

Google Scholar

[3] MAEDA H, MURAKAMI S. A fuzzy decision—making method and its application to a company choice problem[J]. Information Science, l998, 33l~346.

DOI: 10.1016/0020-0255(88)90046-1

Google Scholar

[4] Zhang Dianke, He Mingjun. Study on 500 kV Power Transmission& Transformation Project Comprehensive Post Evaluation[J]. Shanxi Electric Power, 2005, (05): 64-65.

Google Scholar

[5] Li Dongwei, Zhao Huiru, Wang xi. Discussion on Post-assessment Method of Benefit from Power Transmission and Power Transformation Projects of Public Grid[J]. Electric Power Technologic Economics, 2006, (06): 32-36.

Google Scholar

[6] Xu Zhiyong, Zhang Xudong, Zeng Ming, Yan Fan. Application of ANP-based multilevel fuzzy comprehensive evaluation methods to post-evaluation for grid construction projects[J]. East China Electric Power, 2009, (03): 448-491.

Google Scholar

[7] Song Lianjun, Xu Zhiyong. Research on Post-evaluation of Power Grid Construction Project Based on Improved FAPH[J]. Technology Economics, 2009, (10): 52-54.

Google Scholar

[8] Han Fuchun, Ren Tingting, Chen Jingjing. Based on the Level of Analysis After the Power Transmission Project Evaluation Studies[J]. Electrical Engineering, 2009, (02).

Google Scholar

[9] Yang Hongwei, He Yongxiu, Li Dezhi. et al. Comprehensive Post-Evaluation Method of Power Network Renovation Project Based on Fuzzy Interval Evaluation and Analytic Hierarchy Process[J]. Power System Technology, 2009, (5): 33-37.

Google Scholar