[1]
Mingzheng Cai, Haisheng Wang, Xiaolong Xu, Binbin Xu. Research on Embedded Microprocessor in Construction Machine Control System [J]. Road Machinery & Construction Mechanization, 2006 (09): page 45-46.
Google Scholar
[2]
Mei Liu, Fang Zhao, Hui Wang, Kesen Yang. Application and Development of Hydraulic Transmission Technology on the Driving System of Construction Machinery [J]. Machinery Design & Manufacture, 2006 (06): 123-124.
Google Scholar
[3]
Barry Brumitt, Anthony Stentz, Martial Hebert, CMU UGV Group. Autonomous Driving with Concurrent Goals and Multiple Vehicles: Experiments and Mobility Components [J]. 2002: page 45-46.
Google Scholar
[4]
Yin Li, Haijun Li, Shujun Zhang, Changchun Bo. The Estimation of Time Delay in Network- control Based on Fuzzy AHP [J]. Journal of Jiamusi University (Natural Science Edition), 2010 (03) 34-35.
Google Scholar
[5]
Zhi Wang, Tianran Wang, Ye-qiong SONG, Youxian Sun. Survey of Real-Time Schedule Theory and the State-of-the-Art of Its Application in Industrial Real-Time Communication System (Part Two) [J]. Information and Control, 2002 (02): 67-68.
DOI: 10.1109/isie.2002.1026055
Google Scholar
[6]
Branicky M S, Phillips S M, Zhang W. Stability of networked Control Systems: Explicit Analysis of Delay. Proceedings of the American Control Conference, 2000: 23-24.
DOI: 10.1109/acc.2000.878601
Google Scholar
[7]
Tie Huang, Zhiwei Du, Lili Wang. Logix 5000 PLC and the Implementation of SYMADYN-D Profibus DP Communication [J]. Journal of Anshan University of Science and Technology, 2008 (Z1): 57-58.
Google Scholar
[8]
Jinghua Han. Application of Control Technology of Automation Network to Metallurgical Industry [J]. China Metallurgy, 2005, December, Vol. 15, (12): page 134-135.
Google Scholar