Assembly Unit Division Method Based on Connection Strength

Article Preview

Abstract:

Through analysing the assembly relation between the product parts, this paper divided the product parts into function parts and the connectors. Then the simplified assembly semantic relation graph model was established in this paper. The concept of assembly connection strength was introduced to express the complexity of assembly between the parts. Using the least assembly time as the goal to determine the optimal unit division number, the assembly unit division was accomplished based on the connection strength. Finally using the spindle box of HTC2500hs as an example to check this division method, the results show that this method has applicability and effectiveness.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2118-2121

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Xia Zhixiang. Research on Semantic-based Virtual Assembly Modeling and Assmebly Operation Reasoning Method Application[M]. Shanghai: Shanghai Jiaotong University, (2009).

Google Scholar

[2] Wu Rui. Research on Assembly Key Technologies Oriented to Process Reuse[D]. Changsha: National University of Defense Technology, (2008).

Google Scholar

[3] Ericsson Anna, Erixon Gunnar. Controlling Design Variants: Modular Product Platforms[M]. New York: American Society of Mechanical Engineers, (1999).

Google Scholar

[4] Zhou Wei. Key Technology Research on Assembly Planning with Units Division[M]. Shanghai: East China University Of Science and Technology, (2011).

Google Scholar

[5] Hu Fuhua, Zhen Xiaolin, Gan Honghua. Collaborative Filtering Algorithm Based on Similarity Propagation[J]. Computer Engineering, 2011, 37(10): 50-51.

Google Scholar