Simulation and Optimization of Job Shop Scheduling for Dry Transformers Based on eM-Plant

Abstract:

Article Preview

The model of job shop scheduling to fabricate dry transformers is constructed by Object-oriented Petri Net (OPN) in this paper, the essential attributes and ways of all object classes are defined to judge if there is a deadlock in the system. The overall OPN model of job shop scheduling is built according to relations of event actions in the manufacturing system. Product processes in the job shop is simulated by eM-Plant software to reconstruct and optimize the manufacturing system at last.

Info:

Periodical:

Edited by:

Long Chen, Yongkang Zhang, Aixing Feng, Zhenying Xu, Boquan Li and Han Shen

Pages:

382-386

DOI:

10.4028/www.scientific.net/AMM.43.382

Citation:

J. F. Ni and K. Z. Tang, "Simulation and Optimization of Job Shop Scheduling for Dry Transformers Based on eM-Plant", Applied Mechanics and Materials, Vol. 43, pp. 382-386, 2011

Online since:

December 2010

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.