p.361
p.366
p.371
p.376
p.382
p.387
p.391
p.397
p.401
Simulation and Optimization of Job Shop Scheduling for Dry Transformers Based on eM-Plant
Abstract:
The model of job shop scheduling to fabricate dry transformers is constructed by Object-oriented Petri Net (OPN) in this paper, the essential attributes and ways of all object classes are defined to judge if there is a deadlock in the system. The overall OPN model of job shop scheduling is built according to relations of event actions in the manufacturing system. Product processes in the job shop is simulated by eM-Plant software to reconstruct and optimize the manufacturing system at last.
Info:
Periodical:
Pages:
382-386
Citation:
Online since:
December 2010
Authors:
Price:
Сopyright:
© 2011 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: