The Research of Safety Management Model of Shield Metro Construction Based on PCA-AHP-FUZZY

Article Preview

Abstract:

This paper proposes the index set of safety management of shield metro construction, then realizes the PCA dimension of the 24 indexes in the set. By integrating and restructuring the 9 principal component which we got as the SPSS operate result, the Index System of safety management of shield metro construction is built up. Combined with FUZZY theory, the safety management model of shield metro construction is established. Finally, combined the practical engineering, this paper analyzes the result of safety management, and gives the improvement suggestion against the shield metro construction.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1032-1037

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] H. Yi, Z. Zhou, Urban subway construction safety analysis and control countermeasures, Theoretical Science, 5 (2011) 43-49.

Google Scholar

[2] L. Ding, X. Wu, The subway project construction safety evaluation standard research, China Civil Engineering Journal, 11 (2011) 122-127.

Google Scholar

[3] X. Zhu, Y. Chen, SPSS Method and Application of Multivariate Statistical Analysis, Tsinghua University Press, Beijing, (2011).

Google Scholar

[4] Q. Pang, D. Du, Modern Comprehensive Evaluation Method and Case Selection, Tsinghua University Press, Beijing, (2008).

Google Scholar

[5] L. Chen, H. Zhao, PCA application in the large target integrated dynamic analysis, Journal of Industrial, 4 (2011) 435-437.

Google Scholar

[6] L. Zeng, X. Rong, Fuzzy analytic hierarchy process (ahp) application in the subway safety risk management, Proceedings of Engineering academic conference for security and protection, 2 (2010) 124-129.

Google Scholar