Difficulties and Countermeasures on Restricting the Development of Project Management

Article Preview

Abstract:

Difficulties of engineering supervision are mainly in the complex beneficial relationship among the owner, supervision and contractor. Owners lack of knowledge on the need of supervision and uneven quality of supervision personnel bring about disjunction in the stage of decision making, design and construction during the project operating process. The measures can be used to introduce a new mechanism to eliminate the economic dependence between the supervision unit and the owner, enhance the construction of laws and regulations in supervision, improve the three main competitive consciousnesses and ability of the construction market, and strengthen the engineering and construction market regulation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1808-1811

Citation:

Online since:

October 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] J. Ding, Building design work path under the market economy condition, Construction & Design. 6 (1999) 3-6.

Google Scholar

[2] X. Tian, On the cost control in engineering design phase, Construction Economics, 6 (2000) 45-46.

Google Scholar

[3] H. Li, Analysis on difficulties in building engineering construction supervision and countermeasures, Henan Building Materials, 4 (2008).

Google Scholar

[4] Q. Luo, Elemental analysis on the reasons for unfeasibility of design supervision, Sichuan Construction Scientific Research, 1 (2003) 101-102.

Google Scholar