First Drainage Vent Test of Diversion Tunnel of DJIPLOHO Hydropower Station

Article Preview

Abstract:

DJIPLOHO conducts the first drainage vent test of diversion tunnel after completing in the construction of hydropower station with a water commissioning. Through the data analysis and research for the testing process, it is necessary and has flexibility to adjust accurately the drainage. Test results verify the rational design and safety of the tunnel and prove the correctness of first drainage tests procedures. It also accumulates valuable experience for the same type of drainage project for the first time.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

556-560

Citation:

Online since:

October 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] SL 279-2002, Specification for Design of Hydraulic Tunnel, China Water Power Press, Beijing, (2002).

Google Scholar