Pre-Camber Analysis for Hanging Cradle Construction of Qinhe Bridge

Article Preview

Abstract:

In order to ensure the safety of long-span continuous prestressed concrete girder bridge constructed by hanging cradle method, a pre-camber is always made to reduce shrinkage and creep in the process of post-operation, the late loss of pre-stressed, deformation produced by live load and so on. Combining with Qinhe Bridge, how to install the pre-camber is studied in this paper. The maximum pre-cambers and their locations of every span of Qinhe Bridge are determined by the method of standard JTG D62-2004 with the finite element analysis software MIDAS/CIVIL. The results show that the final pre-camber curves calculated by the method of standard JTG D62-2004 and quadratic parabolic method have cusps, which cannot meet the standard requirements for the smooth of the bridge. But the slop of the final pre-camber curve calculated by cosine curve at the maximum pre-cambers and the pier top is zero, and the slop of curve from pier top to the mid-span is small, which satisfy the standard requirements for the smooth of bridge. Therefore, the final pre-camber curve should be calculated by cosine curve.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

923-925

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Y. Zhang, S. Cao, Study on the problem of continuous rigid frame bridge construction geometry control, Chinese and Foreign Highway, 6 (2006) 83-86.

Google Scholar

[2] JTG D62-2004, Code for Design of Highway Reinforced Concrete and Prestressed Concrete Bridges and Culverts, China Communications Press, Beijing, (2004).

Google Scholar

[3] G. He, Y. Li, Z. Zou, et al, Effect of concrete creep on pre-camber of continuous rigid-frame bridge, Journal of Central South University of Technology, s1 (2008) 337−341.

DOI: 10.1007/s11771-008-0376-1

Google Scholar

[4] Y.B. Zhang, D.P. Liu, Research on Setting of Pre-Camber of Long-Span Continuous Rigid Frame Bridge with High Piers, Advanced Materials Research, 255-260 (2011) 821-825.

DOI: 10.4028/www.scientific.net/amr.255-260.821

Google Scholar