Exploration of Rotation Lowering with Building RC Box-Rib Arch Bridge

Article Preview

Abstract:

Arch rib construction of Zhenzhu Bridge on the road from Wuchuan to Pengshui in Guizhou uses construction technology of vertical casting in the first place, and then vertical rotation, and the total weight of which is 610t. This paper introduces technical points and process of vertical rotation construction, and has made beneficial exploration and summary of such kind of construction technology.OverviewBridge rotation construction has advantages including saving costs for hoisting and erecting frames, reducing risks of frames losing stability when casting arch rib concrete, convenient, flexible, safe, reliable and good integrated construction operation, structural line type and internal forces are easy to adjust and control, small range requirement of construction site, and low impact on surrounding environment. Bridge rotation construction would have a broad application prospect in the practice of bridge construction, especially in Chinas southwest area with wide distribution of deep groove and dangerous gully, such construction method is more advantageous. Therefore, practice and research on such construction technology are very practical and significant.Ordinary vertical rotation construction is to have low casting or arch rib assembling, and then lift upward to reach the designed location. Concrete arch rib construction of Zhenzhu Bridge on the road from Wuchuan to Pengshui in Guizhou uses the technology of negative-angle vertical rotation construction, vertical casting arch rib, and then lowering rotation with weight of 610t. Such construction technology is used in China for the first time, while current vertical rotation of the same type of RC arch rib in China has the maximum weight. Based on emphasis on introducing construction technology characteristics of this bridge, this paper also includes innovation and beneficial exploration on the new construction technology of negative-angle vertical rotation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

100-104

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhang Lian-yan, Cheng Mao-fang, Tan Bang-ming. Bridge Turning Construction Technology [M]. Beijing: China Communications Press, (2003).

Google Scholar

[2] Xu Sheng-qiao, Yin Hao-hui. Design and Construction of Yajisha Bridge[J]. Railway Standard Design, 2000(5). 9-16.

Google Scholar

[3] Song Xiang-wu. Design and Construction Techniques Vertical Turning of Steel Tube Arch For Guijiang NO. 3 Bridge. Railway Standard Design, 2001, 21(1). 20-22.

Google Scholar

[4] Liu Xue-feng, Tian Zhong-chu, Yan Dong-huang. Analysis of Lifting-cable Force of Arch Bridge with Vertical-Lifting Rotationg Construction[J]. Journal of Changsha Communications University, 2006, (6). 16-19.

Google Scholar

[5] Peng Li-zhi, Li De-qin, Liu Wei. Design Features of Vertical Rotation Technology in Dongping Bridge at Foshan City[J]. Highway, 2006, 3. 139-145.

Google Scholar

[6] Chen Bao-chun, Sun Chao, Chen You-jie. Application an Development of Swing Method of Bridge Construction in China[J]. Journal of Highway and Transportation Research and Development, 2001, 18(4). 20-2.

Google Scholar