p.285
p.290
p.294
p.299
p.303
p.308
p.312
p.318
p.322
Automatic Maintenance and Temperature Measurement System Prestressed Concrete Box Girder in the Use of Crack Control
Abstract:
In the Xiamen-Shenzhen Railway 32 m-span prestressed concrete box girder construction process, concrete box girder cracks always confused engineering and technical personnel, is a common and more difficult to solve quality problems, for box girder concrete surface cracks issues were discussed, and put forward a repair program to be applied in construction practice.
Info:
Periodical:
Pages:
303-307
Citation:
Online since:
October 2013
Authors:
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: