Automatic Maintenance and Temperature Measurement System Prestressed Concrete Box Girder in the Use of Crack Control

Article Preview

Abstract:

In the Xiamen-Shenzhen Railway 32 m-span prestressed concrete box girder construction process, concrete box girder cracks always confused engineering and technical personnel, is a common and more difficult to solve quality problems, for box girder concrete surface cracks issues were discussed, and put forward a repair program to be applied in construction practice.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

303-307

Citation:

Online since:

October 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Jin Bingqiang. The massive concrete box girders during curing temperature measurements and control methods. Construction & Design, 2009 (06).

Google Scholar

[2] Niu HaoPeng. The precast girder automatic sprinkler health technology. Management & Technology . 2012 (03).

Google Scholar

[3] Liuguo Tao, Tian Pengcheng, Tian Yali. Precast the Automatic sprinkler health technology. Urban construction theory . 2012 (16).

Google Scholar