An Exploration on Prevention and Treatment Plan on Water and Soil Loss in the Construction of Trenched Pipeline Projects

Article Preview

Abstract:

Taking the Shandong section of Shandong-Anhui product oil pipeline project as an example, this paper makes a preliminary summarization on the prevention and treatment plan on water and soil loss in this kind of project aiming at slope stability and runoff regulation. Through the lasting monitoring on soil and water conservation in the process of actual construction and operation, this plan can effectively prevent water and soil loss in project area and get expected results.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1042-1045

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Yongjun Zhao, Dewen Jiang, Pujin Yuan: Research of Soil and Water Conservation Vol. 6 (2005), pp.71-75 (in Chinese).

Google Scholar

[2] Zhe Wu: Soil and Water Conservation in China Vol. 12 (2011), pp.54-56 (in Chinese).

Google Scholar

[3] Hongjun Wei, Bo Hu, Shaoping Zhu: Journal of Yangtze River Scientific Research Institute Vol. 11 (2010), pp.89-92 (in Chinese).

Google Scholar

[4] Mingjun Zhao: Soil and Water Conservation in China Vol. 10 (2011), pp.19-21 (in Chinese).

Google Scholar