Abstract:

The functional testing is necessary based on the analysis the shortage of substation equipment on-line monitoring system, such as the problems about difficult interoperability and data sharing in case of the various communication protocols. The substations function is described in detail before introduce the functional testing. In this paper, the system functional testing was given under two kinds of environment. One is the testing platform is used to debugging instrument, another is used to the device for signal-input source and analysis. Finally, a method for substation equipment functional testing of IEC 61850-based system is presented which will contribute to the effectiveness and equivalences of the testing.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2384-2388

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] L.H. Tsoukalas, R. Gao. From Smart Grids to an Energy Internet: Assumptions, Architectures and Requirements[C]. DRPT, 6-9, April, 2008, Nanjing, China.

Google Scholar

[2] Hao X W, Zhang G J, Zhang W, et al. On-line monitoring technology for the insulation condition of capacitive-type substation equipment[C]/Condition Monitoring and Diagnosis, 2008. CMD 2008. International Conference on. IEEE, 2008: 1220-1223.

DOI: 10.1109/cmd.2008.4580508

Google Scholar

[3] Qing-dong F, Yong-liang L. Research and engineering practice of intelligent substation system[C]/Advanced Power System Automation and Protection (APAP), 2011 International Conference on. IEEE, 2011, 3: 1757-1761.

DOI: 10.1109/apap.2011.6180622

Google Scholar

[4] Liu Y, Gao H, Li N, et al. A solution for intelligent reconstruction of 110kV Pingyin substation[C]/Innovative Smart Grid Technologies-Asia (ISGT Asia), 2012 IEEE. IEEE, 2012: 1-5.

DOI: 10.1109/isgt-asia.2012.6303221

Google Scholar

[5] Yiqing L, Houlei G, Xin W, et al. Study on new type of IED with integrated functions in intelligent substation[C]/Advanced Power System Automation and Protection (APAP), 2011 International Conference on. IEEE, 2011, 1: 161-165.

DOI: 10.1109/apap.2011.6180403

Google Scholar

[6] YanMing R, ZhiMin W, Xi T, et al. Testing system for substation automation system based on IEC61850[C]/Advanced Power System Automation and Protection (APAP), 2011 International Conference on. IEEE, 2011, 3: 2396-2399.

DOI: 10.1109/apap.2011.6180829

Google Scholar

[7] Apostolov A, Vandiver B. Functional testing of IEC 61850 based IEDs and systems[C]/Power Systems Conference and Exposition, 2004. IEEE PES. IEEE, 2004: 640-645.

DOI: 10.1109/psce.2004.1397723

Google Scholar

[8] He L, You-Qun S, Jian-Ping L, et al. Testing Technology on Very Fast Transient Overvoltage in 500kV HGIS Intelligent Substation[C]/Instrumentation, Measurement, Computer, Communication and Control (IMCCC), 2012 Second International Conference on. IEEE, 2012: 363-366.

DOI: 10.1109/imccc.2012.89

Google Scholar

[9] Feng J, Lijun Q. Research on scheme of intelligent component IED of intelligent substation[C]/Advanced Power System Automation and Protection (APAP), 2011 International Conference on. IEEE, 2011, 1: 480-483.

DOI: 10.1109/apap.2011.6180450

Google Scholar

[10] Chen J, Ren Y, Gao X, et al. The research on conformance testing platform of numerical substation[C]/Electricity Distribution, 2008. CICED 2008. China International Conference on. IEEE, 2008: 1-5.

DOI: 10.1109/ciced.2008.5211709

Google Scholar