Research of Risk Control of Public Construction Project Based on Fault Tree

Article Preview

Abstract:

According to characteristics of the project characteristics, fault tree analysis method is adopted and fault tree model is established to decompose the reasons that affect the project schedule layer by layer. Taking a dam construction project as an example, according to the degree of structural order, various factors are explored to calculate the degree of influence of the delay in progress, and the corresponding measures are proposed to control the schedule.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1682-1685

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wei Zhong, Bo Wang. Analysis of Determining Price on Repurchase Phase by BT Project Owner [J], Construction Economics, 2012(9): 52-55.

Google Scholar

[2] Zhenyu Zhao, Yisheng Liu. Introduction of Fault Tree Analysis of Project Risk Management[J], Modern Power, 2002, 19: 95-99.

Google Scholar