Planning and Control in Construction of LW3-1 Jacket

Article Preview

Abstract:

According to Chinese traditional classification, large-sized jackets weight over 10,000 tons and stand in over 100-meter water. Large-sized jackets are different from the normal in construction tonnage, structural dimension and quality control requirements as well as construction difficulty. More complicated construction technology and programme, higher grade of materials, stricter control requirements on node weld and higher risks all need matched stricter, more meticulous and more comprehensive management in planning and scheduling. Combined with construction of LW3-1 deep-water jacket, this paper describes the planning, tracking progress, process control and optimization.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

277-281

Citation:

Online since:

December 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] LW3-1 Project Team, Construction plan of LW3-1 jacket. COOEC (Qingdao). China. January. (2011).

Google Scholar