p.97
p.103
p.109
p.115
p.121
p.127
p.135
p.141
p.147
Assignment of Labour to a Production Line Depending on Lot Size
Abstract:
The paper describes the results of real simulation project in production line. The aim was to optimize the number of workers according to the different orders during one working week, to minimize time for orders realization with using the alternative technological processes, to minimize the length of order processing at maximum the number of workers on the shift. The simulation optimization was used for solution finding.
Info:
Periodical:
Pages:
121-126
Citation:
Online since:
January 2014
Keywords:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: