[1]
Wei Gang,Wu Weili,Hu Danyun,et al.Distributed generation and effects of its parallel operation on power system[J].High Voltage Engineering,2007,33(1):36-40.
Google Scholar
[2]
Li Bei,Li Xingyuan.Distributed generation sources and their effects on distribution networks[J].Power System Technology,2005,29(3):45-49.
Google Scholar
[3]
Chen Haiyan,Duan Xianzhong,Chen Jinfu.Impacts of distributed generation on steady state voltage stability of distribution system[J].Power System Technology,2006,30(19):27-30.
DOI: 10.1109/pes.2006.1709198
Google Scholar
[4]
Qian Kejun,Yuanyue.Distributed generation technology and its impact on power systems[J].Relay,2007,35(13):25-29.
Google Scholar
[5]
Cheng Hanpeng,Li Xiaohui.Overview on distributed generation and effects of its parallel operation on power system[J].Neijiang Science & Technology,2011(2):38.
Google Scholar
[6]
Wang dan.Modeling and Stability Simulation of Distributed Generation [D].Tianjin:Tianjin University,2009.
Google Scholar
[7]
Wang Chengshan,Chen Kai,Xie Yinghua,et al.Sitting and sizing of distributed generation in distribution network expansion planning[J].Automation of Electric Power Systems,2006, 30(3):38-43.
Google Scholar
[8]
Gu Chenghong,Ai Qian.The optimal layout of distributed generation in distribution system[J].Journal of Shanghai Jiaotong University,2007,41(11):1896-(1900).
Google Scholar
[9]
Li Peng,Lian Chao,Li Botao.A graph-based optimal solution for sitting and sizing of grid-connected distributed generation [J].Proceedings of the CSEE,2009,29(4):91-96.
Google Scholar
[10]
Zheng Zhanghua,Ai Qian,Gu Chenghong,et al.Multi-objective of distributed generation considering environmental factor[J].Proceedings of the CSEE,2009,29(13):23-28.
Google Scholar
[11]
Xia Chengjun,Cui Hong,Wang Qiang,et al.Penetration capacity calculation for distributed generation considering static security constraints[J].Power System Technology,2009,33(16): 96-100.
Google Scholar
[12]
Li Bin,Liu Tianqi,Li Xingyuan.Impact of distributed generation on power system voltage stability[J].Power System Technology,2009,33(3):84-88.
Google Scholar
[13]
Qiu Xiaoyan,Xia Lili,Li Xingyuan.Planning of distributed generation in construction of smart grid[J].Power System Technology,2010,34(4):7-10.
Google Scholar
[14]
Jiao baocong,Chen lanping.Thoughtway and application of operations[M]. 1 edition.Beijing:Peking university press,2008:1-30.
Google Scholar
[15]
Wu yuhua,Zhu wei,Li xinquan,et al.interval analytic hierarchy process:IAHP[J].Journal of Tianjin university,1995,28(5):700-705.
Google Scholar
[16]
Feng Xiangqian,Wei Cuiping,Hu Gang,et al.Consistency of interval judgment matrix[J].Control and Decision,2008,23(2):182-186.
Google Scholar
[17]
Chen Dexin,Zhang Fangwei.The supplement and improvement of a interval-numbers algorithm[J].Journal of Liaocheng University,2009,22(2):20-21.
Google Scholar
[18]
Liu Qingjun,Zou Xiaomei.Based on interval numbers and its application[J].Systems Engineering,2005,23(5):120-123.
Google Scholar
[19]
Xu Zeshui.Algorithm for priority of fuzzy complementary judgement matrix[J].Journal of Systems Engineering,2001,16(4):311-314.
Google Scholar