The Application of Project Management Maturity Model

Article Preview

Abstract:

With the application and development of modern Project Management technology, Project Management Maturity Model (PM3) made great progress and become a tool. This paper reviews the development history of project management maturity model, researches comparingly on several PM3, points out that scientific research can evaluate the project management ability by using PM3s theory and find out shortages, then seek method and approach to improve continually on project management. At last, The concrete application process and effect of PM3 are analyzed using examples. Keywords-Project Management Maturity Model; Manufacturing maturity; project management ability

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1707-1712

Citation:

Online since:

December 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] PMI, An Executive guide to OPM3, NewYork: Project Management Institute, (2004).

Google Scholar

[2] Adriana Bicego, Pasi Kuvaja, Software Process Maturity and Certification, Journal of Systems Architecture, Vol. 42, pp.611-620, (1996).

DOI: 10.1016/s1383-7621(96)00045-8

Google Scholar

[3] Terence J, Cooke—Davies, Andrew Arzymanow, The maturity of project management in different industries: An investigation into variations between project management models, Project Management, Vol. 21, pp.471-478, (2000).

DOI: 10.1016/s0263-7863(02)00084-4

Google Scholar

[4] PekkaBerg, Mikko Leinonen, Virpi Leivo, et al, Assessment of Quality and Maturity Level of R&D, International Journal of Production Economics, Vol. 78, pp.29-35, (2002).

DOI: 10.1016/s0925-5273(00)00166-3

Google Scholar

[5] Lixiong Ou, Jiajun Yuan, Weidong Wang, The Research of SHEN-ZHOU E Boat Project Management Maturity Model, Chinese Space Science and Technology, No. 5, pp.1-9, (2005).

Google Scholar

[6] W. S, Humphrey,W. I, Sweet, A method for assessing the software engineering capability of contractors, USA, SEI Technical Report(SEI-87-TR-23), (1989).

Google Scholar

[7] Guoping Yang, Wanhua Qiu. The Project Management Maturity Model Dynamic Development Research, Beihang University Transaction, Vol. 5, No. 23, pp.49-52, (2010).

Google Scholar

[8] Weidong Wang, Lixiong Ou, Jiajun Yuan, The establish and application of SHEN-ZHOU project management maturity model, Space Flight Engineering, Vol. 1, No. 16, ppl-4, (2007).

Google Scholar

[9] James S, Penny packer, Kevin P, Grant, Project management maturity:An industry benchmark, Project Management Journal, Vol. 34, No. 1, pp.4-11, (2003).

Google Scholar

[10] C Williams Ibbs, Young HoonKwak, Project Management Process Maturity Model, http: /www. ce. berkeley. edu/ibbs/yhkwak/pmmaturity. html.

Google Scholar

[11] John Schlichter, Organizational Project Management Maturity Model Program Plan, OPM3 Program plan, OPM3 Programplanver. 1. 3. 9, (2000).

Google Scholar

[12] Yihai He, Weibing Chang, The weapon equipment research project risk elevation of based on manufacturing maturity,. Project Management Technology, Vol. 7, No. 7, pp.54-58, (2009).

Google Scholar