Fuzzy Comprehensive Evaluation Research of Construction Safety of Large Cross

Article Preview

Abstract:

Using the fuzzy evaluation theory,through the establishment of the safety of large cross construction of fuzzy evaluation model, using AHP to evaluate the safety of large cross construction, the comprehensive safety evaluation,and points out its advantages and disadvantages. The fuzzy control is conducive to the management level of large-scale cross constructionsafety improve, to the great guidance for other types ofcity rail traffic.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

437-440

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Health&Safety commission. Advisory committee on Major Hazards. Third Report. The control of Major Hazards. London, (1976).

Google Scholar

[2] Li Yan-wei, wu Xiao-guang, gao Xue-lei. Research of the Risk Factors' Synthesis Weights during the Construction of a Bridge Based on Related to Consistency.

Google Scholar

[3] Chris Uxlade.Bridges.Belitha Press Limited, London House, (1996).

Google Scholar

[4] Rao S S.T'he Finite Element Method in Engineering.Pergamon Press.(1982).

Google Scholar

[5] Bathe K J.Finite Element Procedures in Engineering AnalysisPrentice-Hall, Inc1986.

Google Scholar