Research on Transfer and Replacement Mechanism Design of Inter-Provincial Electricity Treatment in South China Electricity Market

Article Preview

Abstract:

In the context of south china electricity market, the concept of contract transfer and replacement deal is set forth in advance which is specialized in electricity treatment. Then, the feasibility of conducting an inter-provincial contract transfer and replacement is analyzed according to the aspects of physical characteristics, economics and policies within the china southern power grid. In addition, the advantage and disadvantage are also presented in terms of bilateral negotiation and centralized biding transaction modes. After that, the pricing mechanism and transaction mode are deliberately designed pertaining to three different situations including a party power shortage and a party "abandon water", a party power supply shortage and a party power surplus and a party power surplus and a party "abandon water". Finally, the realistic feasibility of the proposed schemes is verified through an employed numerical example.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1695-1701

Citation:

Online since:

February 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zhang Senlin, Zhang Yao, Chen Haoyon, et al. Research on application of bilateral transactions in south China electricity market [J]. Electric Power Automation Equipment, 2009, 29(9): 94-100.

Google Scholar

[2] Zhang Senlin, Chen Haoyong, Qu Shaoqing, et al. Research on bilateral transaction modes and formation mechanism of electricity price in South China electricity market[J]. Power System Technology, 2010, 3(5): 133-140.

Google Scholar

[3] Chen Haoyong, Zhang Senlin, Zhang Yao. Research on transaction model of direct power purchase for large power end-users in electricity market [J]. Power System Technology, 2008, 32(21): 85-90.

DOI: 10.1109/appeec.2009.4918775

Google Scholar

[4] Zhang Senlin. Research on matchmaking tradeoff competition mechanism in regional electricity market, part one, a MCP competition mechanism based on transmission price and loss [J]. Relay, 2006, 34(10): 50-54.

Google Scholar

[5] Zhang Senlin. Research on matchmaking tradeoff competition mechanism in regional electricity market, part two, a PAB competition mechanism based on transmission price, loss and environmental expenditure [J]. Relay, 2006, 34(11): 66-70.

Google Scholar