A Feasibility Urban Power Network Black-Start Scheme Based on Gas-Steam CCPP

Article Preview

Abstract:

This paper designs and discusses black-start scheme based on a gas-steam combined cycle power plant (CCPP) in Tianjin power grid of China. First, considering the structure characteristics and station service power connection mode of the gas-steam unit, the diesel generator is chosen as fast self-starting unit. Also two self-starting schemes of direct starting and variable frequency starting are designed. Second, the technical feasibility of two schemes is determined through first loading capability test and bus voltage level test. After investment estimation comparison, the scheme II is chosen as recommended scheme. The research process proposed in this paper has certain reference significance to power grid black-start.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1723-1726

Citation:

Online since:

February 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Lindstrom, R.R. Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation. Power Systems, IEEE Transactions on [J], 1990 5(1) 162 – 168.

DOI: 10.1109/59.49101

Google Scholar

[2] WANG Zhuo-yu, LIU Zhe, LIANG Wei-ping. Design of Zhanghewan Pumped Storage Power Station as a Black Start Power Supply. Hydropower Automation and Dam Monitoring[J],2008, 32(4)30-32.

Google Scholar

[3] WANG Xu-feng. Application and Test of the Black Start-up Power Project of Jiangsu Grid Generation Company[J]. Jiangsu Electrical Engineering. 2011, 30(1): 48-50.

Google Scholar

[4] ZHOU Yun-hai, SHEN Guang, WEI Xue. A Feasibility Study on the Use of Combined Cycle Power Plant as Black-start Unit [J]. Automation of Electric Power System. 2008, 32(14): 99-103.

Google Scholar

[5] Huang Xianchao ; Zhang Lizi ; Taylor, G.A. Service restoration of distribution system with Distributed Generation[C]. Power System Technology (POWERCON), 2010 , Page(s): 1-5.

DOI: 10.1109/powercon.2010.5666388

Google Scholar

[6] Thale, S. Agarwal, V. A smart control strategy for the black start of a microgrid based on PV and other auxiliary sources under islanded condition[C]. Photovoltaic Specialists Conference (PVSC), 2011, Page(s): 002454-002459.

DOI: 10.1109/pvsc.2011.6186443

Google Scholar

[7] Xisheng Tang ; Zhiping Qi. Energy storage control in renewable energy based microgrid[C]. Power and Energy Society General Meeting, 2012, Page(s): 1-6.

DOI: 10.1109/pesgm.2012.6345000

Google Scholar

[8] ZHAO Ying-bing, ZHOU Shui-bin, MA Zhao-yang. Research and manufacture of merging unit based on IEC 61850-9-2[J]. Power System Protection and Control, 2010, 38(6): 105-106.

Google Scholar