Current Development of Urban Distribution Network

Article Preview

Abstract:

With the rapid development of Chinese urban construction and economic, the electricity load grows quickly. Power cuts have occurred from time to time at the highest load peak especially in the urban and rural that economic grows fast. There are many problems of power supply. Through the analysis of the Mianchi County, this paper puts forward measures to solve the problem. Taking the measures and According to the requirements of the plan, we will build a strong distribution network. It can provide high quality and reliable power resources for economic development, urban construction and people's living.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1876-1879

Citation:

Online since:

February 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] China power press. New City (county towns) grid planning and design [M]. 2007: 349.

Google Scholar

[2] Chunlin Xu. Construction of urban distribution network planning and design [J]. Chengshi Jianshe yu Shangye Wangdian. 2010, (8): 257-258.

Google Scholar

[3] Wenpeng Xin, Peng Li. Urban distribution network planning and design of technical principles Analysis in heilongjiang province [J]. Beijing Dianli Gaodeng Zhuanke Xuexiao Xuebao. 2011, (11): 218-219.

Google Scholar

[4] Chuhuan Wei. The study of power distribution automation system in urban planning [J]. ChengShi Jianshe LiLun Yan Jiu. 2012, (13): 52.

Google Scholar

[5] Zhiwei Li. Urban distribution network Planning and Design introduction. Electrotechnics Electric. 2011, (7): 62-63.

Google Scholar