Study on Design of Tunnel Section for Danba Diversion Tunnel

Article Preview

Abstract:

Analyzing and Evaluating the stability of the surrounding rock is an indispensable and important part in the tunnel design. In this paper, the surrounding rock stability of Danba hydropower station diversion tunnel is dealt with, FLAC3Dsoftware is used for stability analysis. Selecting three different cross sections for calculation models, comparing with the displacement and principal stress and the plastic zone which calculated by FLAC3D, we can evaluate their stability and get the best diversion tunnel design.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1732-1735

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Dong XingLin and Gao JiZhang, Review on application of vertical shaft tunnel rebuilt by diversion tunnel, Water Power, China, p.47–50, August (1953).

Google Scholar

[2] Ai KeMing and Luo KeXiang, Engineering example of reconstructing the diversion tunnel to permanent structures, Hunan Hydro&Power, p.2–5, March (1994).

Google Scholar

[3] Lai Xu and Chen Ling, The influence of using the diversion tunnel on hydraulic transient of hydropower plants, Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific, pp.1-6, March (2009).

DOI: 10.1109/appeec.2009.4918888

Google Scholar

[4] Yang Yang, Ming Xiao, Stability Analysis of Diversion Tunnels in Hydropower Plant subjected to Initial Impoundment" , APPEEC , 11 Proceedings of the 2011 Asia-Pacific Power and Energy Engineering Conference, PP. 1-4, March (2011).

DOI: 10.1109/appeec.2011.5748565

Google Scholar