Numerical Analysis of Safety on Waste-Dumping Cover-Slope out of the Tailings Dam

Article Preview

Abstract:

Mining companies intend to solve the problem of waste dump and reduce the production cost by dumping a large number of waste soils to cover slope outside the running tailings. Therefore, in order to discuss the safety of waste dump slope covering in front of the tailings dam, numerical method was adopted to study the seepage-line change law, the pore water pressure and anti-sliding safety before and after the waste dump covering out of tailings dam. The researches show that the key to waste-dump slope safety are the drainage performance of waste dump bottom layer and the anti-sliding safety of waste dump soil. The appropriate waste dump slope work can improves the tailings dams safety and solves the waste dump problem in mining production.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

178-184

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] S.M. Zan, Y.Y. Fan, J. Wan, G.Z. Song. Submitted to MORDEN MINING, 2013 (2), pp.93-96. In Chinese.

Google Scholar

[2] J. Mo, S.X. Zhang. Submitted to Proceedings of Mining frontier science and technology forum, 2006, 11, p.47 ~ 50. In Chinese.

Google Scholar

[3] The People's Republic of China standard. Safety technical regulations for the tailing pond (AQ2006-2005).  Beijing: China Standard Press, 2004. In Chinese.

Google Scholar

[4] The People's Republic of China standard. Metal and nonmetal mine safety regulations(GB16423-2006). Beijing: Standards Press of China, 2006. In Chinese.

Google Scholar

[5] The People's Republic of China standard. Waste dump safety regulations for metal & nonmetal mines (AQ2005-2005). Beijing: Coal Industry Press, 2005. In Chinese.

Google Scholar