Numerical Analysis of Safety on Waste-Dumping Cover-Slope out of the Tailings Dam
Abstract:
Mining companies intend to solve the problem of waste dump and reduce the production cost by dumping a large number of waste soils to cover slope outside the running tailings. Therefore, in order to discuss the safety of waste dump slope covering in front of the tailings dam, numerical method was adopted to study the seepage-line change law, the pore water pressure and anti-sliding safety before and after the waste dump covering out of tailings dam. The researches show that the key to waste-dump slope safety are the drainage performance of waste dump bottom layer and the anti-sliding safety of waste dump soil. The appropriate waste dump slope work can improves the tailings dams safety and solves the waste dump problem in mining production.
Info:
Periodical:
Pages:
178-184
Citation:
Online since:
January 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: