Research on the Decision-Making Model of Container Cranes' Renewal

Article Preview

Abstract:

Container cranes renewal is an important issue related to the port production efficiency. Considered of characteristics of container crane production, the author use the method of mathematical programming and analyze its renewal decision, establish a renewal decision-making model based on container crane life cycle management, and provide an example analysis. The research achievement can be used for diagnosis and assessment of container crane and other port equipment.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

460-466

Citation:

Online since:

January 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Park B, Hong K, Huh C: Time-efficient input shaping control of container crane systems. In: Proceedings of the 2000 IEEE Inter. Conf. on Control Applications, Anchorage, Alaska, USA. (2000).

DOI: 10.1109/cca.2000.897403

Google Scholar

[2] Jusisi Myllarniemi, Jussi Okkonen, Hannu Karkkainen: Utilizing Business Intelligence Framework For Leveraging Product Lifecycle Management, Finland. (2009).

Google Scholar

[3] Xiaoming Zhang, et al.: Equipment renewal decision based on LCC theory, Jilin, China. (2004).

Google Scholar

[4] Junliang He, Weijian Mi, Daofang Chang, Zhicheng Bian:Evaluation for the Design Proposal Selection Problem of Quayside Container Cranes via Simulation, Shanghai, China. (2011).

Google Scholar

[5] Caris, A., et al. : Network analysis of container barge transport in the port of Antwerp by means of simulation. J. Transp. Geogr. (2010).

Google Scholar