The Study of Train Operation Plan of Night Train on Beijing-Guangzhou High-Speed Railway under Segmented Rectangular Maintenance Time Window

Article Preview

Abstract:

Considering the demand of night train on Beijing-Guangzhou high-speed railway, two modes of segmented rectangular maintenance time window are discussed. Methods to make train operation plans under these two modes are proposed, aiming at shortening the train waiting time and making the departure and arrival time more reasonable. Comparing the new designed train operation plans with the original one under the vertical rectangular maintenance time window, it shows that segmented rectangular maintenance time window is better in night train operation.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

619-623

Citation:

Online since:

January 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Shuiguo Min, Liuyong Huang: Journal of Beijing Jiaotong University. Vol. 32(2008), p.16. In Chinese.

Google Scholar

[2] Boling HAN, Changhai Tian and Yubin Wang: China Railway Science. Vol. 30(2009), p.95. In Chinese.

Google Scholar

[3] Pingxiang Wang, Huizhi Xu and Yuli Ying, et al: Technology & Economy in Areas of Communications. Vol. 9(2007), p.84. In Chinese.

Google Scholar

[4] Lei Nie, Bisong Hu, Linghui Fu and Lu Tong: Journal of Transportation System Engineering and Information Technology. Vol. 10(2010), p.66. In Chinese.

Google Scholar

[5] Qiyuan Peng, Jian Luo: Railway Transport and Economy. Vol. 29(2007), p.65. In Chinese.

Google Scholar