[1]
Highway division of ministry of transport. New concept highway design guidance. Beijing: People traffic publishing house, 2005(7), p.2~12.
Google Scholar
[2]
Zhang Xiuli. Research for Highway Landscape Assessment. Xi'an: Doctor thesis of Chang'an University (2007).
Google Scholar
[3]
Smita M, Lee E.F., MalcolmT. J, Jim M. Examining the effect of alternative Management strategies on landscape-scale forest patterns in northeastern Minnesota using LANDIS. Ecological Modeling, 2004, 180, p.73~87.
DOI: 10.1016/j.ecolmodel.2004.01.019
Google Scholar
[4]
Countryside Agency and Scottish Natural Heritage (1999) Interim Landscape Character Assessment Guidance, UK Countryside Agency, Cheltenham.
Google Scholar
[5]
Gary R. Clay, Robert K.S. Assessing the Validity and Reliability of Descriptor Variables Used in Scenic Highway Analysis. Landscape and Urban Planning, 2004, 66, p.239~255.
DOI: 10.1016/s0169-2046(03)00114-2
Google Scholar
[6]
Chen Yuren, Zhu Zhaohong et al, Research on indexes system of road environment impact assessment. Journal of Tongji University (Natural Science Edition) (1996).
Google Scholar
[7]
Wang Zhaohui, Wang Xuancang et al. An Approximation Method of Interval Numbers for Comprehensive Evaluation of Pavement Performance. Journal of Highway and Transportation Research and Development. (2009), 26(1), p.21~24.
Google Scholar
[8]
Zhang Jijun, Fan Yuying, et al. TOPSIS of Multiple Attribute Decision Making Problem With Interval Valued Weight [J]. Systems Engineering and Electronics, . 2002, (11), p.76~77.
Google Scholar
[9]
Dang Yaoguo, Liu Sifeng, et al. Study on Incidence Decision Making Model of Multi-Attribute Interval Number. Journal of Nanjing University of Aeronautics&Astronautics. 2004, 36(3).
Google Scholar
[10]
Yuan Chunyi. Study on Some Development Problems of Highway Post-evaluation in China. Xi'an: Doctor Thesis of Chang'an University (2009).
Google Scholar