Analysis of Slimhole Drilling Technology Application in Shengtuo District

Article Preview

Abstract:

In order to develop marginal oil reservoir and save drilling cost,since 2006 Shengli Oilfield began to do research of slim hole drilling technology. After a summary trial of 13 wells in Shengtuo area, Analysis the existence of technical difficulties and solutions of slimhole. Preliminary formed a set of suitable technology for Shengli oil field, especially the slim hole drilling in Shengtuo area, The average penetration rate reached 18.39m/h, The average drilling period is 10.69d. The experience provides reference to the same kind of wells in shengli oilfield.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2607-2611

Citation:

Online since:

February 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] K.K. Millheim. Slim Hole Drilling Technonlogy-Past, Present, Future. SPE30151, (1995).

Google Scholar

[2] Wenkui Li. The development status of domestic and foreign Slimhole Drilling Technology [J]. Natural Gas Industry. 2009, 29(9): 54-56. In Chinese.

Google Scholar

[3] Adelmo Schenato. Innovative Approach In Slim Hole Drilling. SPE29925, (1995).

Google Scholar

[4] Haoyu Sun. Research of hydraulic pressure loss calculation of Slim hole [J]. China Petroleum Machinery. 2011, 39(10): 49-53. In Chinese.

Google Scholar

[5] K. Akgun. Theoretical and Experiment Evaluation of Drill Pipe Stability Conditions In Slim Holes. SPE37392, (1996).

DOI: 10.2118/37392-ms

Google Scholar

[6] Sheming Liu. Analysis of Slimhole Drilling application in Changqing Oilfield [J]. Drilling Production Technology. 2009, 32(4): 26-27, 33. In Chinese.

Google Scholar

[7] Mingwang Peng. Study of improving drilling speed of the slim hole [J]. FAULT BLOCK OIL & GAS FIELD. 2007, 14(2): 66-67. In Chinese.

Google Scholar