Start-Up of the Anaerobic Fluidized Bed
Abstract:
Inoculated with anaerobic digester sludge of municipal sewage treatment plant, using the method of organic load increasing, anaerobic fluidized beds was started-up after 82 days. At organic loading rate of 5kgCOD/m3·d, the COD removal rate was 81%. The structure of this biofilm is good and propitious to further domestication.
Info:
Periodical:
Pages:
695-698
Citation:
Online since:
February 2014