Study on Optimization of Numerical Simulation for Smooth Blasting Parameters in Xishimen Iron Mine

Article Preview

Abstract:

In order to make normal rock avalanche but not have significant impact on other parts of surrounding rock and produce evident deformation in the process of blasting heading, the basic mechanical property of rocks in Xishimen Iron Mine was taken as example to analyze. The process of coupling charge blasting in the surrounding holes of smooth blasting was simulated by applying the finite element numerical simulation software ANSYS/ LS-DYNA. The result shows that the surrounding rock has smallest stress and spall normally when borehole spacing of surrounding holes is 0.6m, thus boosting the efficiency of smooth blasting.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

605-610

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zhou Neng-juan.Simulation analysis of tunnel blasting in jointed rock mass[D].Doctoral Dissertation.Jilin:Jilin University,2011.

Google Scholar

[2] LIAO Xiao-cui, PU chuan-jin, GUO Xue-bin.Analysis of main influencing factors on smooth blasting results[J].INDUSTRIAL MINERAL & PROCESSING, 2008(7):18-21.

Google Scholar

[3] Ding Huang-ping.Study on the Shaping Effect of Jointed Rock Mass Under Blasting in Tunnel[D]. Doctoral Dissertation.Jilin:Jilin University,2009.

Google Scholar

[4] FU Yu-hua, LI Xi-bing, DONG Long-jun.Analysis of smooth blasting parameters for tunnels in deep damaged rock mass[J].Rock and Soil Mechanics, 2010, 31(5):1421-1425.

Google Scholar

[5] ZHANG Jin, SHEN Li-jin.SMOOTH BLASTING DESIGN IN FULL SECTION EXCAVATION OF THE TUNNEL[J].ENGINEERING BLASTING, 2012, 18(3):44-47.

Google Scholar

[6] YAN Guo-bin, YU Ya-lun.NUMERICAL SIMULATION OF AIR AND WATER MEDIUM DECOUPLING CHARGE BLASTING[J].ENGINEERING BLASTING, 2009, 15(4):13-19.

Google Scholar

[7] GU Yi-lei, LI Xiao-hong, DU Yun-gui, etc.Reasonable Smooth Blasting FactorUsed in Tunnel[J].Journal of Chongqing University(Natural Science Edition):2005, 28(3):95-97.

Google Scholar

[8] SONG Wei-dong, XU Wen-bin, WAN Hai-wen, etc.Failure rules of surrounding rock in stope and controlling techniques for roadway of high-stage backfilling method[J].JOURNAL OF CHINA COAL SOCIETY, 2011, 9(S2):287-292.

Google Scholar