The Choice of 10 kV Neutral Point Operation Mode in Fushun Grid

Article Preview

Abstract:

This paper discusses that the capacitive current is a must of producing arc grounding overvoltage, and the method and necessary to restrain arc grounding over voltage. It also explains the concept of capacitive current and arc suppression coil, and the test method and significance of measuring capacitive current. Based on the comprehensive field test and evaluation of 29 substations, it provides the correct selection of neutral point operation mode and gives a development direction to 10 kV power network neutral point grounding method of Fushun grid.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

728-732

Citation:

Online since:

March 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Ping Shaoxun, Zhou Yufang. Analysis of Power System Neutral Point Grounding and Running. China Power Press, (2010).

Google Scholar

[2] Tan Qiong, Li Jinglu, Li Zhiqiang, Lightning Protection Technology of Mountainous Grid. China Water Power Press, (2011).

Google Scholar

[3] Yin Kening, Principle of Transformer Design. China Power Press, (2010).

Google Scholar

[4] Chen Jiabin, Gao Xiaofei. The Lightning Protection and Grounding Practical Techniques of Electrical. China Waterpower Press, (2011).

Google Scholar

[5] Fang Daqian. Quick Search and Count manual for Transformer. China Waterpower Press, (2004).

Google Scholar