[1]
S. Chanas, P. Zielin´ ski, Critical path analysis in the network with fuzzy activity times, Fuzzy Sets and Systems. 122 (2001), p.195–204.
DOI: 10.1016/s0165-0114(00)00076-2
Google Scholar
[2]
J.J. Buckley. Positivistic linear programming with triangular fuzzy numbers, Fuzzy Sets and Systems. 26 (1988), p.135–138.
DOI: 10.1016/0165-0114(88)90013-9
Google Scholar
[3]
S. Chanas, D. Dubois, P. Zielin´ ski, On the sure criticality of tasks in activity networks with imprecise durations, IEEE Transactions on Systems, Man, and Cybernetics – Part B: Cybernetics 32 (2002), p.393–407.
DOI: 10.1109/tsmcb.2002.1018760
Google Scholar
[4]
S. Chanas, J. Kamburoswk. The use of fuzzy variables in PERT, Fuzzy Sets and Systems 5 (1981) p.1–9.
DOI: 10.1016/0165-0114(81)90030-0
Google Scholar
[5]
S. Chanas, P. Zielin´ ski, The computational complexity of the criticality problems in a network with interval activity times, European Journal of Operational Research 136 (2002) , p.541–550.
DOI: 10.1016/s0377-2217(01)00048-0
Google Scholar
[6]
M.F. Shipley, A. de Korvin, K. Omer, BIFPET methodology versus PERT in project management: fuzzy probability instead of the beta distribution, Journal of Engineering and Technology Management 14 (1997) 49–65.
DOI: 10.1016/s0923-4748(97)00001-5
Google Scholar
[7]
K. Kurihara, N. Nishiuchi, Efficient Monte Carlo simulation method of GERT-type network for project management, Computers & Industrial Engineering 42 (2002), p.521–531.
DOI: 10.1016/s0360-8352(02)00050-5
Google Scholar
[8]
C. Ragsdale, The current state of network simulation in project management theory and practice, Omega 17 (1989) , p.21–25.
DOI: 10.1016/0305-0483(89)90016-9
Google Scholar
[9]
Kenzo Kurihara, Nobuyuki Nishiuchi. Efficient Monte Carlo simulation method of GERT-type network for project management. Computers & Industrial Engineering. Volume 42, Issues 2–4, 11 April 2002, P. 521–531.
DOI: 10.1016/s0360-8352(02)00050-5
Google Scholar
[10]
MCCAULLEY, JW. AN INTRODUCTION TO PERT AND CPM . COMMUNICATIONS OF THE ACM. 1963. VOL. 7. No. 6.P. 364-365.
Google Scholar
[11]
Zhiwei Zhu; Heady, R.B. A simplified method of evaluating PERT/CPM network parameters Engineering Management, IEEE Transactions on. 1994. VOL. 41. NO. 4.P. 426-430.
DOI: 10.1109/17.364568
Google Scholar
[12]
Ming Lu;S. M. AbouRizk. Simplified CPM/PERT Simulation Model . Journal of Construction Engineering and Management. 2000. VOL. 126. NO. 3.P. 219-226.
DOI: 10.1061/(asce)0733-9364(2000)126:3(219)
Google Scholar
[13]
WEBER, A. PROJECT-MANAGEMENT WITH CPM, PERT AND PRECEDENCE DIAGRAMMING, 3RD EDITION - MODER, J, PHILLIPS, C, DAVIS,E. DATA MANAGEMENT. 1984. VOL. 22. NO. 5. P. 8.
Google Scholar