[1]
L. O. Oyedele and K. W. Tham, Clients' assessment of architects' performance in building delivery process: Evidence from Nigeria, Build. Environ., vol. 42, no. 5, p.2090–2099, May (2007).
DOI: 10.1016/j.buildenv.2005.06.030
Google Scholar
[2]
M. J. Horman, D. R. Riley, A. R. Lapinski, S. Korkmaz, M. H. Pulaski, C. S. Magent, Y. Luo, N. Harding, and P. K. Dahl, Delivering green buildings: process improvements for sustainable construction, J. Green Build., vol. 1, no. 1, p.123–140, (2006).
DOI: 10.3992/jgb.1.1.123
Google Scholar
[3]
I. Rahmat, The Planning and Control Process of Refurbishment Projects, PhD thesis, (1997).
Google Scholar
[4]
D. Hes, ' Green ' building : turning observation into practice, (2005).
Google Scholar
[5]
Y. Y. Ling, Model for Predicting Performance of Architects and Engineers, J. Constr. Eng. Manag., vol. 128, no. 5, p.446–455, (2002).
Google Scholar
[6]
A. Durmus-pedini and B. Ashuri, An Overview of the Benefits and Risk Factors of Going Green in Existing Buildings, Int. J. Facil. Manag., vol. 1, no. 1, p.1–15, (2010).
Google Scholar
[7]
J. Mansfield, Sustainable refurbishment: policy direction and support in the UK, Struct. Surv., vol. 27, no. 2, p.148–161, (2009).
DOI: 10.1108/02630800910956470
Google Scholar
[8]
Z. Ma, P. Cooper, D. Daly, and L. Ledo, Existing building retrofits: Methodology and state-of-the-art, Energy Build., vol. 55, p.889–902, Dec. (2012).
DOI: 10.1016/j.enbuild.2012.08.018
Google Scholar
[9]
B. C. Authority, Existing Building Retrofit in Singapore, The Centre for Sustainable Buildings and Construction, Building and Construction Authority, Singapore, (2010).
Google Scholar
[10]
S. M. Sood, K. H. Chua, and L. Y. Peng, Sustainable Development in the Building Sector : Green Building Framework in Malaysia, ST-8 Best Pract. SD Constr., p.1–8, (2011).
Google Scholar
[11]
Ministry of natural resources and environment malaysia, National policy on climate change, (2009).
Google Scholar
[12]
M. Bilec, R. Ries, and H. Matthew, Sustainable Development and Green Design—Who Is Leading the Green Initiative?, J. Prof. Issues Eng. Educ. Pract., vol. 133, no. 4, p.265–269, (2007).
DOI: 10.1061/(asce)1052-3928(2007)133:4(265)
Google Scholar
[13]
G. Ofori and H. L. Kien, Translating Singapore architects' environmental awareness into decision making, Build. Res. Inf., vol. 32, no. 1, p.27–37, Jan. (2004).
DOI: 10.1080/09613210210132928
Google Scholar
[14]
A. S. Ali and R. Zakaria, Complexity of statutory requirements : case study of refurbishment projects in malaysia, J. Build. Perform., vol. 3, no. 1, p.49–54, (2012).
Google Scholar
[15]
I. Rahmat, The planning and control process of refurbishment projects, University College London, UK, (1997).
Google Scholar
[16]
X. Zhang, L. Shen, and Y. Wu, Green strategy for gaining competitive advantage in housing development: a China study, J. Clean. Prod., vol. 19, no. 2–3, p.157–167, Jan. (2011).
DOI: 10.1016/j.jclepro.2010.08.005
Google Scholar
[17]
C. O. Egbu, Skills , knowledge and competencies for managing construction refurbishment works, Constr. Manag. Econ., vol. 17, no. 1, p.29–43, (1999).
DOI: 10.1080/014461999371808
Google Scholar
[18]
A. S. Ali and C. -P. Au-Yong, The designer in refurbishment projects: implications to the compatibility of design, Struct. Surv., vol. 31, no. 3, p.202–213, (2013).
DOI: 10.1108/ss-11-2012-0038
Google Scholar
[19]
H. Kezner, Project management: a system approach to planning, scheduling and controlling, Tenth edit. New Jersey: John Wiley & Son, (2009).
Google Scholar
[20]
J. R. Mansfield, The use of formalised risk management approaches by UK design consultants in conservation refurbishment projects, Eng. Constr. Archit. Manag., vol. 16, no. 3, p.273–287, (2009).
DOI: 10.1108/09699980910951672
Google Scholar